Glossary · Configurators

Bill of materials (BOM)

In short

A bill of materials (BOM) is the structured list of raw materials, assemblies, parts and quantities needed to make a product [2]. A configurator can derive it from the chosen variant.

What a BOM contains

A BOM lists the raw materials, sub-assemblies, intermediate assemblies, parts and the quantity of each needed to manufacture an end product [2]. In German practice it is called a Stückliste and usually carries item number, part number, description and quantity [1].

BOMs in a configurator

A configurator can derive the BOM from the configuration: rules decide which parts are added and in what quantity. In ERP, a super BOM often covers all variants and the rules select the matching lines [3]. Engineer-to-order manufacturers use this route to create BOM and routing from the inputs gathered at quote stage [4].

On a website there are three levels:

LevelWhat the buyer seesPurpose
Parts overviewplain-language list of the main partsunderstanding, plausibility
Indicative quantitieslines with quantities, marked as example valuesqualified enquiry
Production BOMpart numbers, binding, from ERPorder, only with integration

Example from the library

The dock kit configurator shows a parts list with indicative quantities that recalculates with every change. It appears on screen, in the enquiry text and in the PDF, each time marked as simplified example values. Fictional product.

What to watch

A BOM on a website is only as good as its source. Decide whether it is binding or indicative, and say so. Binding BOMs belong in the system that manufactures; the configurator then hands over the configuration only. How a parts list fits into an enquiry is covered in quote requests and lead routing.

Related terms

  • Variant configurator

    A variant configurator only assembles product variants that can actually be built, using characteristics and rules. In German usage the term is often a synonym for product configurator; inside ERP, rules select the matching components and operations.

  • Configuration rules (rule engine)

    Configuration rules (also called constraints or a rule engine) decide which options are valid together: dependencies, exclusions, size limits and calculations. They make sure a configurator only allows variants that can actually be built.

  • Request for quote (RFQ)

    A request for quote (RFQ) is how a configurator ends when no fixed price is possible: the checked configuration goes to sales or a dealer, who turn it into a binding quote.

  • Product data and PIM

    Product information management (PIM) is the process of managing the information needed to market and sell products, from one central hub that feeds websites, catalogues, marketplaces and partners. For a configurator, a PIM can be the source of options, texts and part numbers.

  • ETO, CTO, ATO (production strategies)

    ETO, CTO and ATO describe how much of a product is fixed before the order: engineer to order designs it after the order, configure to order assembles it from pre-defined options, assemble to order builds it from ready-made components.

Examples to try

Example configurator · fictional product

Floating dock kit configurator

Put together a floating dock kit: straight, L or T shape, lengths, access ramp with a tilt check, swim island and timber deck – with a parts list and a PDF enquiry.

Docks & marine · Dimensions and sizes · Materials and finishes · Options, modules and accessories

Example configurator · fictional product

Modular shelving configurator

A wood and steel shelving system: bays and levels, widths and depths, fronts per bay, timber and frame colour, free-standing or wall-hung – with rules, a variant count and a parts list.

Partitions, guarding & shelving · Dimensions and sizes · Colours · Materials and finishes

More in our guides

Sources

  1. Wikipedia: Stückliste
  2. Wikipedia: Bill of materials
  3. SAP Help Portal: Variant Configuration (LO-VC)
  4. Wikipedia: Engineer to order

← All terms in the glossary