The strategies at a glance
| Strategy | Fixed before the order | After the order | What a configurator does |
|---|---|---|---|
| Make to stock (MTS) | finished product | ship from stock | selection, few rules |
| Assemble to order (ATO) | components | assembly | valid combination of components |
| Configure to order (CTO) | options and rules | assembly, possibly manufacture | rules, BOM, specification |
| Engineer to order (ETO) | product concept | design and manufacture | capture needs, pre-check feasibility |
Build to order (also make to order) is the umbrella for anything built only after a confirmed order [2]. In assemble to order, products are assembled from components only once an order is placed; assembly is quick, components have lead time [3]. Engineer to order fits when the details of an order are not yet known and engineering must be added to lead time [1].
What it means for a configurator
- ATO and CTO are the classic field of variant configurators: rules are known, and the configuration can become a bill of materials and an order directly.
- ETO cannot be fully configured. Many ETO manufacturers still shorten lead time by generating most of the BOM and routing from inputs gathered at quote stage, which SAP calls variant configuration [1][4]. A web configurator then covers the standardisable part and passes the rest on as open points in the request for quote.
Mixed models are normal
Most manufacturers mix strategies: standard sizes from stock, common variants as CTO, special solutions as ETO. A good configurator shows where the line is, for example "special size, checked individually" rather than a hard block. See 3D configurators for manufacturers.