Industries & use cases

Locker and washroom cubicle configurator for manufacturers

What a 3D configurator needs for makers of toilet cubicles, IPS duct panels and lockers: room layout, clearances, plan view, finishes and enquiry.

Short answer: for a maker of toilet cubicles, duct panels, vanity units or locker installations, a configurator is worth building when it plans a room rather than a single cubicle: the cubicle run with its end cubicle, urinals and vanity, or the locker banks with their benches, all inside a given room depth. It checks whether doors and corridors have space, draws a dimensioned plan, and sends an enquiry your estimators can price without calling back.

This guide is for managing directors, sales managers and product managers at manufacturers of toilet cubicles and partitions, urinal screens, IPS duct panels with access panels, vanity units, and locker and changing-room storage. Their products go into schools, sports and leisure centres, swimming pools, offices, factories and hospitality venues. Enquiries come from architects and specifiers, from contractors and fit-out firms, from operators such as a school trust or a facilities team, and from distributors.

Washroom cubicle & locker configurator – preview of the example configurator
Example configurator · fictional product · example values. Loads only when you click. Open the demo page →

Why is a washroom configurator different from a product configurator?

  • The product is a room. A cubicle run only makes sense with the room depth, the corridor, the urinals and the vanity next to it. The overall length is the sum of all modules.
  • Doors need space on both sides. An inward-opening door must clear the pan; an outward-opening door swings into the corridor. A locker door swings towards the bench.
  • Two product families, one project. A maker that supplies cubicles and lockers can offer both for the same building: the washroom and the changing room next to it. A tool that handles only one splits the conversation.
  • Material and grid decide the build. Panel thickness, edge detail and finish affect both look and dimensions; for lockers, column width, tiers and lock type decide how many compartments fit on a wall.

A form with "number of cubicles" and "colour" fields answers none of these questions. A plan that shows door swings and the corridor width does.

What about accessible and ambulant cubicles?

In England, Approved Document M volume 2 covers access to and use of buildings other than dwellings [1]; other countries have their own rules. A configurator cannot meet such requirements on its own. It can only apply the rules you, as the manufacturer, set for your products, and responsibility for meeting standards and regulations stays with the manufacturer and the project's designers. That is why the option in our example configurator is called "Large end cubicle (example)" and every clearance is labelled as an example value. For your project we use your verified dimensions and your own notes; we do not set our own.

Which capabilities matter?

CapabilityWhyIn our example configurator
Choose the room: washroom or changing roomBoth product families in one toolYes; values are kept when switching
Cubicle run: count, width, depth, heightOnly sizes you supplyYes, with ranges and example values
End cubicle, duct wall, urinals, vanityEnquire for the whole roomYes
Locker banks: columns, tiers, column width, depth, bench, lockSettles the grid and the locker countYes, live locker count
Panel material, finish, hardware, door colour per bankPrepares the sample stageYes, four panel materials
Plan with dimension chains and door swingsSpecifiers check the roomYes
Clearance checkCatches space problems before the quoteYes, with example values
Enquiry with plan and every choiceEstimators price without a call-backEnquiry text and a PDF
Your prices, parts lists, specification textBudget figures, costing, specificationNo, built in a project

What does a maker gain?

We do not promise figures. The gains are in work that is done twice today:

  • Dimensions, not a sketch. The enquiry states the cubicle count, width, depth, room depth and overall length instead of "about five cubicles".
  • Space problems before the meeting. If the corridor in front of an outward-opening door is too narrow, the specifier sees it on the plan and can change the depth or the layout.
  • Shorter sample discussions. Panel material, colour and hardware are visible on the model, so the sample stage starts from a shortlist.
  • One tool for both rooms. The washroom and changing room of one project arrive in the same format.
  • Comparable enquiries. Every enquiry has the same rows in the same order.

Try the example

Our washroom cubicle and locker configurator is an example configurator with a fictional product and example values, built by Modelwright with its own geometry. Dimensions, clearances and check values are example values, and there is no statement on standards, accessibility, fire safety, hygiene or structure. It has two room types:

  • Washroom: a run of 1 to 8 cubicles, standard on legs or full height, an ambulant cubicle or a large end cubicle with an outward-opening door and grab rails, flush or rebated doors, indicator lock or turn bolt, three row-end options, a duct wall that is off, half height with a shelf or full height with access panels, up to 5 urinals with screens, and a vanity with 1 to 4 basins and a mirror.
  • Changing room: 1 to 4 locker banks with 1 to 6 columns and 1 to 6 tiers each, sloping tops, an attached or freestanding bench, key, combination, coin-return or RFID locks, and a door colour per bank.

On top of that: compact laminate, MFC, timber veneer and solid-colour HPL with swatches, doors that open in the model, a plan with dimension chains, door swings and the turning circle, the clearance check, and an enquiry as text and PDF.

What we checked: an independent QA round recalculated the locker count and dimension chains by hand, for example 2 banks × 4 columns × 3 tiers = 24 lockers. Every clearance check was triggered both ways, and the summary, enquiry text and PDF carried the same rows. Device tests were emulated at eight screen sizes, not run on real phones.

Example configurator · fictional product

Washroom cubicle & locker configurator

Plan a washroom or changing room: cubicle row, end cubicle, duct wall, urinals and vanity, or locker banks with benches – with a plan view, a clearance check and a PDF enquiry.

Partitions, guarding & shelving · Dimensions and sizes · Colours · Materials and finishes

The rules behind it are explained in washroom cubicle configurator rules: lengths, clearances and locker grids.

How would it be built for your range?

For your product we build it on your system: your profiles, pilasters, headrails and hardware, your size tables for cubicles and lockers, your finishes and lock options, your rules for ambulant and accessible cubicles, your enquiry route and, if you want them, your prices and parts lists. Drawings, size tables and photos are usually enough; CAD is used when it suits the web. Who receives the enquiry and how it reaches your estimators or distributors is covered in enquiries from a washroom and locker configurator; the technical side in building a washroom and locker configurator. For cost, see what a 3D configurator costs, and for hiring us, custom 3D configurator development.

Frequently asked questions

Does it replace the washroom design?

No. It delivers a complete enquiry with a plan and dimensions. The survey, services and project requirements are still checked by the designers and your team.

Do cubicles and lockers have to be in one configurator?

No. If you supply only one, we build only that room type. The demo shows both because a washroom and a changing room can sit side by side in one building.

Does it work on a tablet or phone?

Yes, in the browser with no app. Long rooms look small in the angled view on a phone, while the plan stays readable. We tested emulated devices, not physical ones.

Sources

  1. GOV.UK, Approved Document M: access to and use of buildings, publication page with volume 2 (buildings other than dwellings), read 14 November 2026: gov.uk/government/publications/access-to-and-use-of-buildings-approved-document-m
  2. Modelwright library, washroom cubicle and locker configurator, "Live in this demo" list, read 14 November 2026: modelwright.de/en/library/washroom-cubicle-locker-configurator/

Read next