In-plant office configurator rules: wall fields, storeys, stair and clearance

The rules behind an in-plant office configurator: grid, wall fields as wall, glass or door, storeys and stair, rooms, and clearance to the hall ceiling.

Short answer: an in-plant office configurator needs rules on four levels. Grid: which widths and depths give whole wall fields? Fields: what can each field be, and which combinations are not allowed? Storeys: storage deck or second storey with a stair, and does the overall height fit under the hall ceiling? Rooms: how is the inside divided? Our example configurator implements all four with sample values; in a project, your rules apply.

In-plant modular office configurator – preview of the example configurator
Example configurator · fictional product · example values. Loads only when you click. Open the demo page →

Which inputs does an in-plant office have?

InputExample valuesWhat it drives
Grid1,200 mm or 4 ftOutside size and field count
Width, depth2 to 10 and 2 to 8 fields; typical sizes as a startFloor area, wall fields
Wall height2,500, 2,750, 3,000 or 3,250 mmOverall height, stair
StoreysOne storey, walkable storage deck, two storeysStair, railing, overall height
Wall fieldWall, half glass, full glass, door; double door, sliding door, hinge sideGlazing share, access, rules
Rooms1 to 3, solid or half-glazed partitionsRoom areas, interior doors
Ceiling, HVAC, electricsLay-in grid or open; none, wall unit or rooftop unit; basic or plusOverall height with a rooftop unit
Clear hall height4.5 to 14 m in 0.5 m stepsClearance check

All sizes and rules are sample values of a fictional product.

How are wall fields planned?

Each wall is a row of fields on the grid. Tapping a field, in the 3D model or on the plan, cycles it: wall, half glass, full glass, door, and back to wall. Double door, sliding door, hinge side and "whole wall" are set in the field editor. Two rules are built in: a double door needs two fields and so cannot be the last field of a wall, and with two storeys the upper field at the stair landing is always a door.

Floor area, wall-field count and glazing share are calculated live. An example from the independent review: 6 × 4 fields on the 1.20 m grid give 7.2 × 4.8 m, so 34.6 m², and 20 wall fields; with the default layout the demo showed 22 % glazing. All three matched the hand calculation. The 4 ft grid checked out too: 10 × 8 fields gave 118.9 m², and the display switches between metres and feet.

How are storeys and the stair handled?

With a storage deck or a second storey, a stair and railing appear. The stair runs along a chosen side wall, with the landing at the front field. The number of risers is the storey rise divided by 190 mm, rounded up, with a 270 mm going. A worked example from the review: a 3.03 m rise gives 16 risers of about 189 mm and 15 goings, a 4.05 m run in total. If the flight runs past the rear wall, the demo warns.

The stair is an example. Whether a stair suits a given use, which risers, widths and railings apply, and what loads a deck carries are for the manufacturer and the operator to decide; the demo contains no rules for them.

Which checks run?

  • Access: the ground floor needs at least one exterior door.
  • Hall clearance: clear hall height minus the office's overall height must be at least 500 mm, with any rooftop unit or railing counted. Worked example with the demo's values: an office with a storage deck and 2.75 m walls is 4.13 m high including the railing; in a 5.5 m hall that leaves 1.37 m, so the check is green.
  • Door under the stair: no door where headroom under the flight is below 2.2 m.
  • Sliding door: the neighbouring field in the sliding direction must not be a door.
  • Narrow room: rooms narrower than 1.8 m raise a note.

Every limit is an example rule. For your system we replace them with yours, such as maximum span without a column, which fields may take doors, or the load classes of your decks, as your engineering states them.

How is the inside divided?

Up to three ground-floor rooms, separated by solid or half-glazed partitions, each with one interior door. Partitions sit on grid lines, and each room is at least one field wide. An example from the review: 7 × 5 fields split into 2.4, 3.6 and 2.4 m give rooms of 14.4, 21.6 and 14.4 m². Invalid positions are moved to the nearest valid one.

How are ceiling, HVAC and electrics treated?

In the demo these are schematic options: they change the model, the plan symbols and the summary, but they are not engineering. A lay-in ceiling with lights shows in the inside view; a rooftop unit adds to the overall height and so feeds the clearance check. For your system we suggest describing such options as what your quote includes, and treating anything further as a note to settle in conversation.

What comes out at the end?

The review shows every value and check. The enquiry text carries the same rows; the A4 PDF adds a 3D view and a top view. In the independent review, every summary row appeared word for word in the enquiry text.

Example configurator · fictional product

In-plant modular office configurator

Plan an in-plant office on a panel grid: choose the size and storeys, tap wall fields to turn them into windows or doors, set rooms, HVAC, electrical and colours – with a floor plan, a hall-clearance check and a PDF enquiry.

Prefab process cells · Dimensions and sizes · Colours · Materials and finishes

Try it in the in-plant office configurator. Who it is for is covered in in-plant office configurator software, and geometry, floor plan and phones in implementing configurators for stores, booths and enclosures. For a project, see custom 3D configurator development.

Frequently asked questions

Can we add our own panel types?

Yes, such as louvre panels, pass-through windows, roller doors or mesh fields. Each type gets its own geometry and rule builder.

Can the upper storey have rooms?

In the demo the upper storey is one room. Upper partitions are a project requirement.

Does it produce a parts list?

Not in the demo. A list of panels, posts, runners and doors is possible in a project, as are prices per field.

Sources

  1. Modelwright library, in-plant modular office configurator, "Live in this demo" list, read 14 November 2026: modelwright.de/en/library/inplant-office-configurator/